Medium-large municipal and industrial seawater desalination with FEDCO energy recovery.
View Full Product on ForeverPurePlace →
The ForeverPure 446,400 GPD SWRO plant delivers 1,690 cubic meters of potable water per day from seawater, making it well suited for medium-large municipal water supply projects and industrial operations. The system integrates a FEDCO energy recovery turbine to capture hydraulic energy from the brine reject stream, significantly reducing the overall power consumption of the plant.
A multi-train configuration ensures continuous water production even during maintenance, providing the reliability demanded by critical water supply applications.
| Parameter | Value |
|---|---|
| Production Capacity | 446,400 GPD (1,690 m³/day) |
| Feed Water Source | Seawater (up to 45,000 ppm TDS) |
| Recovery Rate | 40–45% |
| Salt Rejection | ≥99.5% |
| Energy Recovery | FEDCO energy recovery turbine |
| Configuration | Multi-train design |
| Operating Pressure | 800–1,000 psi |
| Control System | PLC with SCADA and remote monitoring |
| Power Supply | 380–480V / 3-phase / 50 or 60 Hz |
| Construction | Stainless steel 316L, FRP piping |
Our engineering team will design a system tailored to your water source, site conditions, and capacity requirements.
Request a Quote